Concrete Forming Subcontractor · Metro Vancouver

We form the concrete behind the skyline.

MJF General Contractors is a Maple Ridge–based concrete-forming subcontractor — structural and architectural formwork on high-rise towers across the Lower Mainland since 2018.

Maple Ridge, BC · Forming since 2018

Every tower starts as flat ground.

First, we set the line.

Advanced survey and layout — so every form lands exactly where the drawings say.

Then form the foundation.

Footings and parkade walls, formed deep, square and level — up to seven levels below grade.

And raise the structure.

Slabs, columns, walls and cores — podium to roof, floor cycle after floor cycle.

Floor by floor.

Formwork sets the schedule and the finish. We hit the pour and hold the line.

We form the concrete behind the skyline.

MJF General Contractors — concrete forming for Metro Vancouver's high-rises.

Now forming · SCOTT +77, Delta
Scroll to build
15+
Years in formwork carpentry
9
Landmark towers & developments delivered
40
Storeys on our tallest concrete scope
’18
Forming independently since 2018
Scope of work

What we form

Full structural and architectural formwork — below grade to rooftop. Hand a tower's concrete scope to one accountable crew.

Suspended Slabs & Decks

Deck formwork, engineered pour breaks, sloping decks and re-shoring — podium to roof.

Columns & Walls

Structural and architectural forms held to tight tolerance for a clean, true finish.

Footings & Foundations

Parkade foundations and footings formed deep, square and level for everything above.

Elevator & Stair Cores

Core wall systems with accurate placement of structural steel and composite-timber embeds.

Parkade & Podium

Multi-level underground and podium structures — up to seven levels below grade.

Layout & Surveying

Advanced survey and layout so every form lands on the line the first time.

Currently building SCOTT +77 residential development in Delta, BC at dusk — RealCo Properties
On site now

SCOTT +77

Delta, BC · RealCo Properties · under CIP Construction

We're forming the parkade and podium for RealCo Properties' SCOTT +77 — laying the structural base the development is built on, with the layout precision and pour discipline our GCs rely on.

See the scope
Why GCs invite us back

Formed right, the first time

In concrete, the formwork sets the schedule and the finish. Get it wrong and everything downstream pays for it.

MJF crew formwork in progress on a Metro Vancouver concrete tower against blue sky
Marvin J. FuentesOwner-operator · 15 years in formwork carpentry. On site, accountable, every project.
  • 01

    Safety First

    Strict, WorkSafeBC-compliant site standards. A secure job site for every worker, every pour — no shortcuts.

  • 02

    Built to the Line

    Layout-driven precision and rigorous quality control, so forms land accurate and the concrete comes out true.

  • 03

    On the Schedule

    We hit pour dates and hold the floor cycle. GCs invite us back because we don't hold up the build.

  • 04

    One Accountable Crew

    Licensed, insured and in good financial standing — run hands-on by the owner, not handed down a chain.

Have a concrete scope coming up?

Bring MJF in early and form it right. We bid structural and architectural formwork across Vancouver, Burnaby, Richmond, Surrey, New Westminster and the Lower Mainland.