We form the concrete behind the skyline.
MJF General Contractors is a Maple Ridge–based concrete-forming subcontractor — structural and architectural formwork on high-rise towers across the Lower Mainland since 2018.
Every tower starts as flat ground.
First, we set the line.
Advanced survey and layout — so every form lands exactly where the drawings say.
Then form the foundation.
Footings and parkade walls, formed deep, square and level — up to seven levels below grade.
And raise the structure.
Slabs, columns, walls and cores — podium to roof, floor cycle after floor cycle.
Floor by floor.
Formwork sets the schedule and the finish. We hit the pour and hold the line.
We form the concrete behind the skyline.
MJF General Contractors — concrete forming for Metro Vancouver's high-rises.
What we form
Full structural and architectural formwork — below grade to rooftop. Hand a tower's concrete scope to one accountable crew.
Suspended Slabs & Decks
Deck formwork, engineered pour breaks, sloping decks and re-shoring — podium to roof.
Columns & Walls
Structural and architectural forms held to tight tolerance for a clean, true finish.
Footings & Foundations
Parkade foundations and footings formed deep, square and level for everything above.
Elevator & Stair Cores
Core wall systems with accurate placement of structural steel and composite-timber embeds.
Parkade & Podium
Multi-level underground and podium structures — up to seven levels below grade.
Layout & Surveying
Advanced survey and layout so every form lands on the line the first time.
SCOTT +77
Delta, BC · RealCo Properties · under CIP ConstructionWe're forming the parkade and podium for RealCo Properties' SCOTT +77 — laying the structural base the development is built on, with the layout precision and pour discipline our GCs rely on.
See the scope →Formed right, the first time
In concrete, the formwork sets the schedule and the finish. Get it wrong and everything downstream pays for it.
- 01
Safety First
Strict, WorkSafeBC-compliant site standards. A secure job site for every worker, every pour — no shortcuts.
- 02
Built to the Line
Layout-driven precision and rigorous quality control, so forms land accurate and the concrete comes out true.
- 03
On the Schedule
We hit pour dates and hold the floor cycle. GCs invite us back because we don't hold up the build.
- 04
One Accountable Crew
Licensed, insured and in good financial standing — run hands-on by the owner, not handed down a chain.
Have a concrete scope coming up?
Bring MJF in early and form it right. We bid structural and architectural formwork across Vancouver, Burnaby, Richmond, Surrey, New Westminster and the Lower Mainland.





